当前位置: 首页 > 职业资格 > 问题详情
问题

The manager was _______ that we should deal with all the problems in our department ourselves.

The manager was _______ that we should deal with all the problems in our department ourselves.
A.convincing
B.convinced
C.convince
D.convinces

发布时间:2024-04-26
参考答案

答案:B解析:

相关问题
  • All the people who went to the new supermarket had one great hope: to be the lucky custome

    All the people who went to the new supermarket had one great hope: to be the lucky customer who did not have to pay for

    答案解析
  • Tom: You are playing guitar well. Can you read musi

    Tom: You are playing guitar well Can you read music? Charles: No, I don"t I just listen to songs on the radio and then

    答案解析
  • All the firemen in the city were ______to fight against the big fire.A.called inB.called o

    All the firemen in the city were ______to fight against the big fire A.called inB.called offC.called upD.called on

    答案解析
  • Michael: The Johnsons are moving next week. We are

    Michael: The Johnsons are moving next week We are going to have a going-away party for them Saturday Tracy: I didn"t rea

    答案解析
  • --I thought you wouldn't mind.--Well as a

    --I thought you wouldn "t mind --Well, as a matter of fact, I don " t, but you_____________me first A. should askB. should have askedC. must askD. must have asked

    答案解析
  • Which statement(说法) is true?A. The west coast was a better place to make films.

    Which statement(说法) is true?A. The west coast was a better place to make films B. There are no mountains near Hollywood

    答案解析
  • Project trade-offs vary betweenA.risk cost and sche

    Project trade-offs vary betweenA risk, cost and schedule B direct cost, indirect cost, and resource availabilityC quality, schedule and timeD cost, quality and scheduleE contract terms, scope and budget

    答案解析
  • The range of time allowed for an activity to be completed in is the _____.A.Planned time (

    The range of time allowed for an activity to be completed in is the _____ A Planned time (Duration) B Float time (LS - ES, or LF - EF) C Critical time (when ES = LS, or EF = LF) D Scheduled time (LF - ES) E Event

    答案解析
  • The major difference between PERT and CPM networks is:A.PERT requires three time estimates

    The major difference between PERT and CPM networks is:A PERT requires three time estimates whereas CPM requires one time esti

    答案解析
  • On a precedence diagram the arrow between two boxes is called:A.An activity.B.A constrain

    On a precedence diagram, the arrow between two boxes is called:A An activity B A constraint C An event D The critical path E None of above

    答案解析

最新问题

Copyright © 2016-2023 114题库网(114158.com)All Rights Reserved.  免责声明 豫ICP备19007809号-5