86 Team members want to work for a project manager that can provide them with career path planning. In which organizational form. is career path planning difficult for project employees?
A. Matrix
B. Pure project
C. Project coordinator
D. Project expediter
E. Classical/traditional
发布时间:2024-04-25正确答案:B
Mary: What are you working on? Susan: I'm doing
Mary: What are you working on? Susan: I"m doing some embroidery Mary: ______ Susan: I don"t do very much, just for very
答案解析Ensuring that all work is both authorized and funded by contractual documentation is the r
Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:AThe project managerBThe functional managerCThe project sponsorDThe clientEAll of the above
答案解析Typical characteristics of a work package include:ARepresentation of units of work at a le
Typical characteristics of a work package include:ARepresentation of units of work at a level where work is performedBClearly
答案解析The contractual statement of work (CSOW)A.Must be the same as the proposal statement of wo
The contractual statement of work (CSOW)A Must be the same as the proposal statement of workB Does not identify reporting req
答案解析Going from Level to Level in the work breakdown structure will result inA.Less estimating
Going from Level to Level in the work breakdown structure will result inA Less estimating accuracyB Better control of the pro
答案解析A Work Breakdown Structure:A.assures all work is identifiedB.subdivides the project into m
A Work Breakdown Structure:A assures all work is identifiedB subdivides the project into manageable segmentsC provides the project sponsor with a time-phase task summaryD both A and BE All of the above
答案解析The "control points" in the work breakdown structure
The "control points " in the work breakdown structure used for isolated assignments to work centers are referred to as:A Work packages B Subtasks C Tasks D Code of accounts E Integration points
答案解析The erection of foundation formwork before the placement of foundation concrete would be a
The erection of foundation formwork before the placement of foundation concrete would be an example of a _____ dependency A DiscretionaryB MandatoryC ExternalD Soft logicE Subcontracted
答案解析The actual configuration of a PERT/CPM network _____
The actual configuration of a PERT CPM network _____ the amount of resources that can be devoted to the project A Increases B
答案解析The critical path in a schedule network is the path that:A.Takes the longest time to compl
The critical path in a schedule network is the path that:A Takes the longest time to completeB Must be done before any othe