86Team members want to work for a project manager that can provide them with career path p

86 Team members want to work for a project manager that can provide them with career path planning. In which organizational form. is career path planning difficult for project employees?

A. Matrix

B. Pure project

C. Project coordinator

D. Project expediter

E. Classical/traditional

发布时间:2024-04-25
参考答案

正确答案:B

相关问题
  • Mary: What are you working on? Susan: I'm doing

    Mary: What are you working on? Susan: I"m doing some embroidery Mary: ______ Susan: I don"t do very much, just for very

    答案解析
  • Ensuring that all work is both authorized and funded by contractual documentation is the r

    Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:AThe project managerBThe functional managerCThe project sponsorDThe clientEAll of the above

    答案解析
  • Typical characteristics of a work package include:ARepresentation of units of work at a le

    Typical characteristics of a work package include:ARepresentation of units of work at a level where work is performedBClearly

    答案解析
  • The contractual statement of work (CSOW)A.Must be the same as the proposal statement of wo

    The contractual statement of work (CSOW)A Must be the same as the proposal statement of workB Does not identify reporting req

    答案解析
  • Going from Level to Level in the work breakdown structure will result inA.Less estimating

    Going from Level to Level in the work breakdown structure will result inA Less estimating accuracyB Better control of the pro

    答案解析
  • A Work Breakdown Structure:A.assures all work is identifiedB.subdivides the project into m

    A Work Breakdown Structure:A assures all work is identifiedB subdivides the project into manageable segmentsC provides the project sponsor with a time-phase task summaryD both A and BE All of the above

    答案解析
  • The "control points" in the work breakdown structure

    The "control points " in the work breakdown structure used for isolated assignments to work centers are referred to as:A Work packages B Subtasks C Tasks D Code of accounts E Integration points

    答案解析
  • The erection of foundation formwork before the placement of foundation concrete would be a

    The erection of foundation formwork before the placement of foundation concrete would be an example of a _____ dependency A DiscretionaryB MandatoryC ExternalD Soft logicE Subcontracted

    答案解析
  • The actual configuration of a PERT/CPM network _____

    The actual configuration of a PERT CPM network _____ the amount of resources that can be devoted to the project A Increases B

    答案解析
  • The critical path in a schedule network is the path that:A.Takes the longest time to compl

    The critical path in a schedule network is the path that:A Takes the longest time to completeB Must be done before any othe

    答案解析

最新问题