80What tool have project managers come to use to identify all of the costs associated with

80 What tool have project managers come to use to identify all of the costs associated with a project.

A. A bill of materials

B. A Gantt chart

C. An arrow diagram network.

D. A work breakdown structure.

E. B and C only

发布时间:2024-04-25
参考答案

正确答案:D

相关问题
  • Middle (functional) managers have the greatest influence in the direction of the project i

    Middle (functional) managers have the greatest influence in the direction of the project in which type of organizational structure?A Project B Strong matrix C Weak matrix D Project coordinator E Project expeditor

    答案解析
  • What tool have project managers come to use to identify all of the costs associated with a

    What tool have project managers come to use to identify all of the costs associated with a project A A bill of materialsB A Gantt chartC An arrow diagram network D A work breakdown structure E B and C only

    答案解析
  • It is argumentative whether project managers actually control costs. Which of the followin

    It is argumentative whether project managers actually control costs Which of the following is the most common element over

    答案解析
  • History has shown that project managers can be trained in a combination of ways. Which met

    History has shown that project managers can be trained in a combination of ways Which method is usually preferred by most

    答案解析
  • In the past most project managers have come from _____ fields without proper _____ traini

    In the past, most project managers have come from _____ fields without proper _____ training or education in skillsA Tech

    答案解析
  • In small companies project managers and line managers are:A.Never the same personB.Always

    In small companies, project managers and line managers are:A Never the same personB Always the same personC Sometimes the same personD Always in disagreement with each otherE Forced to act as their own sponsors

    答案解析
  • 19It is argumentative whether project managers actually control costs. Which of the follow

    19 It is argumentative whether project managers actually control costs Which of the following is the most common element ov

    答案解析
  • 43Middle (functional) managers have the greatest influence in the direction of the project

    43 Middle (functional) managers have the greatest influence in the direction of the project in which type of organizational

    答案解析
  • 61In small companies project managers and line managers are: A.Never the same person B.Al

    61 In small companies, project managers and line managers are:A Never the same personB Always the same personC Sometimes the same personD Always in disagreement with each otherE Forced to act as their own sponsors

    答案解析
  • 83Project managers need exceptionally good communication and negotiation skills primarily

    83 Project managers need exceptionally good communication and negotiation skills primarily because: A They may be leading a

    答案解析

最新问题

Copyright © 2016-2023 114题库网(114158.com)All Rights Reserved.  免责声明 豫ICP备19007809号-5