A Project Status Report would include all of the following except:ACost and schedule repor

A Project Status Report would include all of the following except:

A Cost and schedule reports

B Changes to scope. cost or schedule

C Narrative explanation of variances

D Personnel problems on the project

E Upcoming activities

发布时间:2024-04-25
参考答案

正确答案:D

相关问题
  • Which of the following are included as part of a scope statement?A.Project justificationB.

    Which of the following are included as part of a scope statement?A Project justificationB Project deliverablesC Project objectivesD All of the aboveE B and C

    答案解析
  • Which of the following are included in the Acquisition phase(s) of the project life cycle.

    Which of the following are included in the Acquisition phase(s) of the project life cycle A concept and developmentB de

    答案解析
  • The project scope/charter baseline includes:A.Summary

    The project scope charter baseline includes:A Summary of background conditions defining the project B Organization, authority and

    答案解析
  • Management decision-making includes:A.Analysis of alter

    Management decision-making includes:A Analysis of alternatives B Revisions replanning C Resource allocation D Modification or updating of goals and objectives E All of the above

    答案解析
  • Guidelines for estimating time durations include:A.Assuming a normal level of labor and eq

    Guidelines for estimating time durations include:A Assuming a normal level of labor and equipment B Assuming a normal work week

    答案解析
  • In the PDM common constraints include:A.Start-to-st

    In the PDM, common constraints include:A Start-to-startB Finish-to-startC Finish-to-finishD B and C onlyE A, B, and C

    答案解析
  • Cost forecasting calculations include:A.EAC = ACWP +

    Cost forecasting calculations include:A EAC = ACWP + (BAC - BCWP)B EAC = BAC CPIC EAC = ACWP + (BAC CPI)D All of the above E A and B

    答案解析
  • Cost management includes:A.Cost estimating/forecasting.B

    Cost management includes:A Cost estimating forecasting B Cost budgeting cost control C Cost applications D All of the above E A and B only

    答案解析
  • Cost of quality includes:A.Appraisal costB.detection costC.prevention costD.maintenance co

    Cost of quality includes:A Appraisal costB detection costC prevention costD maintenance costE A, B, and C only

    答案解析
  • Traits of a participative manager include:Abeing accessibleBbeing an effective delegatorCh

    Traits of a participative manager include:A being accessibleB being an effective delegatorC holding social gatheringsD All of the above E A and C