Which of the following can be tracked using the WBS?A.timeB.costC.performanceD.scopeE.None

Which of the following can be tracked using the WBS?

A.time

B.cost

C.performance

D.scope

E.None of the above.

发布时间:2024-04-25
参考答案

正确答案:D

相关问题
  • The scope of a project can be expected to change if:A.The project manager must provide cos

    The scope of a project can be expected to change if:A The project manager must provide cost estimates without having a desi

    答案解析
  • Which of the following can result in misinterpretation of the statement of work?A.Using im

    Which of the following can result in misinterpretation of the statement of work?A Using imprecise language (i e nearly, appro

    答案解析
  • The project life-cycle can be described as:A.project

    The project life-cycle can be described as:A project concept, project planning, project execution, and project close-out B projec

    答案解析
  • Which of the following can affect network durations?A.Skills of the resource poolB.Calenda

    Which of the following can affect network durations?A Skills of the resource poolB Calendar datesC ConstraintsD All of the aboveE A and B only

    答案解析
  • Which of the following can we infer from the passage?A.Everyone has his lucky day.B.The su

    Which of the following can we infer from the passage?A.Everyone has his lucky day B.The supermarket is dishonest C.The supe

    答案解析
  • You must produce 27 widgets. You can only produce 9 widgets per production run. Each produ

    You must produce 27 widgets You can only produce 9 widgets per production run Each production line setup costs $1000 Eac

    答案解析
  • _____ of the extra costs of the project can often be attributed to a lack of quality.A.12%

    _____ of the extra costs of the project can often be attributed to a lack of quality A 12%B 15%C 20%D 25%E less than 10%

    答案解析
  • Which of the following can the project manager use as a means of measuring project team ef

    Which of the following can the project manager use as a means of measuring project team effectiveness?A AbsenteeismB Sponsor-approved salary increasesC Efficiency of the teamD Turnover of personnelE Grievances

    答案解析
  • History has shown that project managers can be trained in a combination of ways. Which met

    History has shown that project managers can be trained in a combination of ways Which method is usually preferred by most

    答案解析
  • You can’t modernize____large external investments.

    You can’t modernize____large external investments A fromB onC withoutD unless