To prevent the buyer from opening the L/C late,the exporter should stipulate at the same time in the contract:“The relevant L/C must reach the seller not later than one month before the date of the shipment”.()
发布时间:2021-02-01错误
Copyright © 2016-2023 114题库网(114158.com)All Rights Reserved.  免责声明 豫ICP备19007809号-5